Sliger Trailer
Nose area before (Wall
covering, Ceiling & Carpet was not done by Rader Trim) Nose cabinet. Doors are
recessed panel with bead board panel. Cabinets are left unpainted
– customer will paint cabinets themselves. After customer painted
cabinets Back of long wall before Back of long wall after.
Frig. Cabinet sets at an angle from base cabinet. All cabinets are made of
poplar wood. Straps hold frig while in
transit. 10 gallon hot water heater,
water inlet and winter drain all under the frig cabinet. Front end of long wall
before Closet at front end of long
wall Since cabinets are 18”
deep, this type of closet rod is used. Shelf at top of closet Door at bottom of closet
for access to additional storage Door at bottom of closet for
access to additional storage Base cabinet with sink. After customer painted
cabinet Narrow door in base
cabinet. Shelf is removeable. View of cabinets from bed
area. Top cabinets have 2 doors and microwave. Short wall and floor
before. Swift-lock oak flooring.
Table – Cabinet covers switch box and converter box. Cabinet that covers
electrical boxes makes a table / desk. Boot box (front is recessed
panel to match doors) with faux leather lid. After customer painted
cabinets Additional step to access
bed area. Step has storage space within. Step with storage space. Horse area ceiling before. Horse area ceiling after
installation and covering with white metal Corners insulated and
covered – lights removed and reinstalled. Cowboy shower with
removable shower pan and shower curtain. Shower pan made of marine
plywood and covered with rubber truck bed liner material. Shower pan is easily
removed and a rubber plug fills the drain hole. Shower curtain. Easily
installed and removed. Shower curtain rod |